PM briefed on power projects

ISLAMABAD: Briefing Prime Minister Nasir-ul-Mulk on the water and hydropower projects in the country, Water and Power Development Authority (Wapda) Chairman Muzammil Hussain said on Monday that the construction work on Diamer-Basha and Mohmand dams will begin during the current fiscal year.

Mr Mulk was informed that the Daimer-Basha dam is located on Indus River, about 315km upstream of Tarbela dam, 165km downstream of Gilgit and 40km downstream of Chilas. The dam has a gross water storage capacity of 8.1 million acre feet of water with power generation capacity of 4500MW.

Published in Dawn, 10th July, 2018

https://www.dawn.com/news/1419018/pm-briefed-on-power-projects