Power generation hits all-time peak, transmission and distribution constraints weigh
ISLAMABAD: When Prime Minister Shahid Khaqan Abbasi was claiming credit to have controlled energy crisis at a news conference on Tuesday, a special parliamentary panel was informed by his Power Division that $40-50 billion investment was required in the transmission and distribution system to completely end loadshedding.
Testifying before a Special Committee of the Senate on Circular Debt, Additional Secretary of the Power Division Musaddiq Khan said the power sector’s transmission and distribution network required a lot of upgradation and strengthening to completely overcome loadshedding.
Published in Dawn, 30th May, 2018
https://www.dawn.com/news/1410870/power-generation-hits-all-time-peak-td-constraints-weigh